Quick Links
  • * Home
  • * Contact Us
  • * Online Prospectus
  • * Staff Directory
  • * Calendar
  • * After School Activities
  • * Lunch Menu
  • * Uniforms
  • * Newsletters
  • * News & Events Archive
  • * Media Coverage
  • * Online Application
  • * British High Commissioner's Scholarship
  • * Employment Opportunities
  • * Buses
Campus Development BSKL Kuala Lumpur 10-01-2009
Campus Development: 2009 - 2013

We are excited to be opening The British School in Kuala Lumpur in 2009. We have in place a comprehensive plan for the development of the campus and facilities which will grow as the school grows in number and from Primary to Secondary. Details of future developments are outlined below.
 
11 Persiaran

We will be commencing Foundation and Primary classes at 11 Persiaran Bukit Utama in 2009.

The site is currently undergoing renovation works in preperation for commencement of classes.
 
The campus will provide a warm, modern and extremely well equipped learning environment for students. 

Classrooms are spacious and comfortable and are all equipped with Interactive Whiteboards. This allows teachers the flexibility to work with groups and individuals in different ways to maximize the pace and quality of learning.

A busy sports programme will be supported by a gym and 50m swimming pool. Play areas are divided into sections so that children can play with others of a similar age group on equipment appropriate for their level of ability. This maximizes safety and gives children space and confidence to experiment.

One of the school's main areas of focus is music. Well equipped music facilities will support a well resourced music staff to ensure that a tradition of musical achievement is continued.
 
Build To Suit Campus

We are excited to have secured a beautiful site not far from the 11 Persiaran campus on a greenfield site in Bandar Utama. The site is bordered by parkland on two sides and a well known interntional college on the third. It will house seperate primary and secondary campuses.
 
The new campus has been thoughtfully designed to provide spacious, modern facilities for students and staff. A complete range of facilities will support teachers to provide a broad and challenging curriculum for students.
 
Design quality is of an international standard and will set a new benchmark in Malaysia.

The provision of basement parking and well designed traffic access will avoid traffic jams common at schools in the city.
 
Build To Suit Campus: Phase One

Phase One will be complete in time to commence classes in September 2011 amd will house primary and foundation classes.

The primary campus will feature a warm, welcoming environment to put younger students at ease. Access has been well thought out to ensure the safety of students. For example ramps have been used widely rather than space saving stairs.
 
Areas for different age groups well are well defined. All students can easily access shared facilities such as the dining room, library and gym, however will learn and play with their peer group on equipment which challenges without going outside their range of ability.
 
The campus will be well equipped and resourced. The gymnasium, music centre, science labs, IT labs, basketball court and football field, library and language labs will enable students to benefit from a balanced and rigorous curriculum.
 
Build To Suit Campus: Phase Two

The secondary campus will be complete in 2013. The addition of a swimming pool, theatre, football field, will provide a campus which has a full range of facilities.
 
The secondary campus will also benefit from the addition of more science and IT labs, a music centre, library, dining room, and more classrooms.
 
High quality, modern finishes evident in the primary campus will be altered slightly to provide a more adult feel. As with primary, the secondary allows access to shared facilities such as the theatre and swimming poolm while ensuring students of different age groups have their own spaces to learn and play.
 
Timeline

2008

December Commence fit out works.

2009

March Complete fit out works
Campus open for viewing

Sept Commence Primary Classes

2011

July Complete fit out works.

Sept Commence Primary classes at Build-to-Suit Phase One.

2013

July Complete fit out works.

Sept Commence Secondary classes at Build-to-Suit 
Phase Two

® Copyright 2009. British School of Kuala Lumpur. Powered by Hodfords.